• Call Us : 03082533000 (WhatsApp)
  • Email Us : TestPointpk.com@gmail.com
Sticky Note
Green Line bus service becomes fully operational from:
گرین لائن بس سروس مکمل طور پر کب فعال ہو جائے گی
  1. 9th January 2022
  2. 10th January 2022
  3. 11th January 2022
  4. 12th January 2022
  5. 13th January 2022
Explanation

The Green Line Bus Rapid Transit (BRT), the much-awaited federal-funded mass transit project, finally became fully operational in Karachi on 10th January 2022.

Pakistan launches commercial operations of Karachi's much-awaited 'Green Line' bus service | Arab News PK

Related MCQs

پاکستان نے 100 روپے کا یادگاری سکہ کس منصوبے کے 10 سال مکمل ہونے پر جاری کیا؟
  1. Main Line 1 Project
  2. Orange Line Metro Train
  3. Karachi Circular Railwaym
  4. China-Pakistan Economic Corridor (CPEC)
اس سوال کو وضاحت کے ساتھ پڑھیں

اکتوبر 2020 میں سندھ حکومت نے نگرپارکر، ضلع تھرپارکر میں کون سا ڈیم افتتاح کیا؟
  1. Kalidas Dam
  2. Sohan Dam
  3. Ningharahr Dam
  4. Dasu Dam
اس سوال کو وضاحت کے ساتھ پڑھیں

پاکستان میں "گو کیش لیس" مہم کی قیادت درج ذیل میں سے کس نے کی ہے؟
  1. Ministry of Finance
  2. State Bank of Pakistan
  3. NADRA
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

پاکستان نے مئی 2026 میں کس کروز میزائل کا کامیاب تجربہ کیا؟
  1. Shaheen-IV
  2. Fatah-IV
  3. Babar-IV
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

مئی 2026 میں، پاکستان اور کس ملک نے منشیات کی اسمگلنگ کنٹرول کے حوالے سے تعاون پر دستخط کیے؟
  1. China
  2. Russia
  3. Bangladesh
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

All Rights Reserved © TestPointpk.com