Makran Coastal Highway is being completed with assistance of which country?
مکران کوسٹل ہائی وے کس ملک کے تعاون سے مکمل ہو رہی ہے؟
  1. Canada
  2. USA
  3. China
  4. Japan
Explanation
  • The Makran Coastal Highway is also known as N-10.
    • It stretches 653 km (406 mi) from Karachi in Sindh province to Gwadar in Balochistan.
    • The construction began in 2002.
    • It was completed by 2004 with assistance from China.
    • It connects major cities including Karachi, Ormara, Pasni, and Gwadar.
    • It facilitating transportation and development along the coastal region.

    Related MCQs

    چین اور پاکستان کے درمیان معاہدہ ہونے کے بعد سی پیک منصوبے کا باضابطہ آغاز کب ہوا؟
    1. 20 June 2015
    2. 20 June 2014
    3. 20 April 2014
    4. 20 April 2015
    اس سوال کو وضاحت کے ساتھ پڑھیں

    پاکستان اور چین کو ملانے والی سڑک/ہائی وے کو کیا کہا جاتا ہے؟
    1. Karakoram Highway
    2. Indus Highway
    3. Express Highway
    4. Hamaliya Highway
    اس سوال کو وضاحت کے ساتھ پڑھیں

    پاکستان نے 100 روپے کا یادگاری سکہ کس منصوبے کے 10 سال مکمل ہونے پر جاری کیا؟
    1. Main Line 1 Project
    2. Orange Line Metro Train
    3. Karachi Circular Railwaym
    4. China-Pakistan Economic Corridor (CPEC)
    اس سوال کو وضاحت کے ساتھ پڑھیں

    سیپیک کا مطلب کیا ہے؟
    1. China Pakistan Economic Council
    2. China–Pakistan Economic Corridor
    3. China Pakistan Energy Corridor
    4. None of these
    اس سوال کو وضاحت کے ساتھ پڑھیں

    نادرا کب قائم ہوا؟
    1. March 10, 2001
    2. March 10, 2003
    3. March 10, 2000
    4. None of these
    اس سوال کو وضاحت کے ساتھ پڑھیں

    All Rights Reserved © TestPointpk.com