If 10 persons can do a job in 20 days than 20 persons with twice efficiency can do the same job in ____?
  1. 5 days
  2. 10 days
  3. 3 days
  4. None of these
Explanation

10 persons can do the job in 20 days, which means the total work required is 10 x 20 = 200 person-days.

If 20 persons are working with twice the efficiency, their effective work capacity is doubled, so they can do the work of 40 persons (20 x 2).

Now, let's calculate the time taken by 20 persons with twice the efficiency to complete the same job:

Total work required = 200 person-days

Effective work capacity = 40 persons

Time taken = Total work required / Effective work capacity

= 200 person-days / 40 persons

= 5 days

Related MCQs

  1. 50
  2. 45
  3. 40
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. 5 km
  2. 3 km
  3. 4 km
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. 2 km
  2. 3 km
  3. 4 km
  4. 5 km
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. 5
  2. 10
  3. 15
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. Father
  2. Uncle
  3. Grandfather
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

All Rights Reserved © TestPointpk.com