A is 4 times as fast as B and therefore is able to finish the work in 45 days less than B. A and B, can complete the work in how many days?
  1. 15 days
  2. 12 days
  3. 18 days
  4. None of these
Explanation

A is 4 times as fast as B, so A's rate of work is 4 times B's rate of work.

Since A finishes the work in 45 days less than B, let's assume B takes x days to finish the work. Then A takes x - 45 days to finish the work.

Since A is 4 times as fast as B, A's rate of work is 4 times B's rate of work. So, A's time to finish the work is 1/4 of B's time.

We can set up an equation based on the above: x - 45 = (1/4)x

Solve for x: x - 45 = (1/4)x --> 4x - 180 = x --> 3x = 180 --> x = 60

So B takes 60 days to finish the work, and A takes 60 - 45 = 15 days to finish the work.

Since A and B work together, their combined rate of work is the sum of their individual rates. Let's find their individual rates.

B's rate = 1/60 (work done per day)

 A's rate = 1/15 (work done per day)

Combined rate = (1/60 + 1/15) = (1/60 + 4/60) = 5/60 = 1/12

So A and B together can complete the work in 12 days.

Related MCQs

  1. 50
  2. 45
  3. 40
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. 5 km
  2. 3 km
  3. 4 km
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. 2 km
  2. 3 km
  3. 4 km
  4. 5 km
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. 5
  2. 10
  3. 15
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

  1. Father
  2. Uncle
  3. Grandfather
  4. None of these
اس سوال کو وضاحت کے ساتھ پڑھیں

All Rights Reserved © TestPointpk.com