MASHAIR MANAGEMENT STRATEGY MCQS
khuddam-Ul-Hujjaj 5 years Past Papers Click
here
Download PDF Click
here
چار آپشن میں سے کسی ایک پر کلک کرنے سے جواب سرخ ہو جائے گا۔
ایم-ایچاو ایم ایس قبضے کا ڈیش بورڈ کس نے ڈیزائن اور تیار کیا؟
- NADRA
- Softogate with support from TDS
- SBP
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
- The M-HOMS Occupancy Dashboard was designed and developed by Softogate with support from Team Digital Solutions (TDS).
- It was developed to support real-time monitoring of pilgrim accommodation/occupancy.
- The dashboard helped provide structured digital visibility for Hajj operations.
- It formed part of the broader M-HOMS digital transformation initiative.
Last verified on 26-08-2026
کون سا سسٹم کیو آر کوڈ، درخواست نمبر یا پاسپورٹ نمبر کے حاجی کی مکمل تفصیلات تلاش کرنے کی سہولت فراہم کرتا ہے؟
- TDS Hajj Navigator
- M-HOMS Occupancy Dashboard
- Meal Management System
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
- TDS Hajj Navigator enables authorized users to search and retrieve complete pilgrim details.
- Pilgrim information can be accessed using a QR code, application number, or passport number.
- This supports faster pilgrim identification, verification, and field assistance.
- It is part of TDS’s digital initiatives for the Pakistan Hajj Mission 2026.
Last verified on 26-08-2026
ٹی ڈی ایس کا کون سا پہل بسوں کی لائیو موومنٹ، روانگی/آمد کی ریکارڈنگ اور ای ٹی اے انٹیلی جنس فراہم کرتا ہے؟
- TDS Hajj Navigator
- Meal Management System
- Salawat Transport Management App
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
- The Salawat Transport Management App provides real-time visibility of bus movements.
- It captures departure and arrival information.
- It also provides ETA (Estimated Time of Arrival) intelligence.
- This supports better monitoring and coordination of Hajj transportation operations.
Last verified on 26-08-2026
ٹی ڈی ایس کی نفسیات کا بنیادی مقصد کیا تھا؟
- Reduce dependency on manual processes
- Increase phone-call confirmations
- Eliminate field reporting
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
- The primary objective of Team Digital Solutions (TDS) was to reduce reliance on manual and field-dependent processes.
- TDS introduced structured, technology-supported workflows through M-HOMS.
- The initiatives aimed to improve efficiency, coordination, monitoring, and digital management.
- Digital systems reduced the need for repeated manual reporting and confirmations.
Last verified on 26-08-2026
ٹیم ڈیجیٹل سلوشنز (ٹی ڈی ایس) نے پاکستان حج مشن 2026 کی تبدیلی میں کس نظام کے کردار ادا کیا؟
- UHMS
- M-HOMS
- MSFT
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
- System: M-HOMS (Makkah Hajj Operation Management System)
- Team: Team Digital Solutions (TDS)
- Mission: Pakistan Hajj Mission 2026
- Main role: Digitizing manual and field-dependent processes
Last verified on 26-08-2026
مشن کی ملکیت والی وہیل چیئرز کی نگرانی اور ان کی واپسی کو آسان بنانے کے لیے کیا تجویز کیا گیا ہے؟
- Manual registers only
- Verbal handover only
- QR codes or RFID tracking tags
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
- QR codes or RFID tracking tags are recommended for tracking mission-owned wheelchairs and facilitating their recovery.
- Each wheelchair can be assigned a unique QR code or RFID tag.
- This enables easier identification and tracking of wheelchairs.
- It can help prevent loss and facilitate quick recovery.
- Digital tracking also improves accountability and inventory management.
Last verified on 22-08-2026
حجاج کو دیے جانے والے تحائف کی تقسیم کو انفرادی حجاج کے ساتھ منسلک کرکے ریکارڈ رکھنے کے لیے کون سا نظام تجویز کیا گیا ہے؟
- Manual attendance registers
- QR-linked inventory tracking
- Verbal confirmation
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
- QR-linked inventory tracking is recommended for tracking the distribution of pilgrim gifts against individual pilgrims.
- Each gift can be linked to an individual pilgrim through a QR code.
- This provides a more accurate record of gift distribution.
- It reduces reliance on manual registers and verbal confirmation.
- The system improves transparency, traceability, and accountability.
Last verified on 22-08-2026
مستقبل میں جسمانی مشاعر ٹرین ٹکٹوں کے متبادل کے طور پر کیا تجویز کیا گیا ہے؟
- Digital transit tokens embedded in the Nusuk card or mobile application
- Paper vouchers
- Manual registers
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
- Digital transit tokens embedded in the Nusuk card or mobile application are recommended as the future replacement for physical Mashair train tickets.
- This approach can reduce dependence on physical tickets.
- Digital tokens can make passenger verification faster and more convenient.
- Embedding them in the Nusuk card or mobile application can improve integration.
- It can also support better tracking and management of Mashair train transportation.
Last verified on 22-08-2026
حج 2026 کے دوران سم سروسز کے ساتھ ایک بڑا مسئلہ کیا تھا؟
- Complete network collapse during high-traffic periods, particularly Arafat
- Excessive SIM prices
- Lack of passports
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
- A major problem with SIM services during Hajj 2026 was complete network collapse during high-traffic periods, particularly in Arafat.
- Heavy network traffic created serious connectivity problems.
- Arafat was particularly affected during peak periods.
- Network disruption made communication and connectivity difficult for Hujjaj.
- Reliable SIM and network services are essential for communication during Hajj operations.
Last verified on 22-08-2026
پاکستان سے فلائٹ کی روانگی سے کتنے گھنٹے پہلے ماسٹر ڈیٹا بیس کی تصدیق اور پلیٹ فارم اپ ڈیٹس مکمل کر لیے جانے چاہئیں؟
- 24 hours
- 48 hours
- 72 hours
- None of these
اس سوال کو وضاحت کے ساتھ پڑھیں
Explanation
- Master database validations and platform updates should be completed 72 hours before a flight's departure from Pakistan.
- This advance validation helps ensure that passenger data is accurate and complete.
- Platform updates should be finalized before the departure process begins.
- The 72-hour window allows time to identify and correct discrepancies.
- It supports smoother coordination and reduces last-minute operational issues.
Last verified on 22-08-2026